Ecological & Renewable Resources

Water Conveyance and Diversion Projects
Browse:9Date:2026-03-10

● In water conveyance and diversion projects, pressure regulating devices are installed along the pipeline to adjust the water supply pressure and flow rate using flow control and pressure regulating valves. A residual pressure power generation device can be installed to replace the pressure regulating device.

● Lift-type or drag-type flow power generation devices can be installed in water conveyance channels.


Water Conveyance and Diversion Pipeline Units


Pipeline Units

Next: There is no more.

Ecological & Renewable Resources

Contact Us

  • Hotline:0571-82759303

  • E-mail:office@hzfcenergy.com

  • Corporate Headquarters:Room 1203, Building 1, Hengdeli Minshang Mansion, No. 1681 Shixin North Road, Xiaoshan District, Hangzhou City, Zhejiang Province, China.

  • Production Base 1:No. 91 Ziling Road, Fuchunjiang Town, Tonglu County, Hangzhou City, Zhejiang Province, China.

  • Production Base 2:No. 228 Daling Mountain Road, Fuyang District, Hangzhou City, Zhejiang Province, China.

Copyright © 2026 Hangzhou Fengcheng Energy Technology Co., Ltd. 浙ICP备2026020455号-1

Friendly Links